Healthcare Hub, University of Roehampton
We are currently on site at the University of Roehampton for the delivery of a Healthcare Hub.
The project is progressing well, we achieved the site set up, disconnections, temporary services and diversions before the Christmas shut down period.
The perimeter scaffold for the re-roofing works has now been installed and the re-roofing works commenced on time, in line with the programme and is progressing at a good pace.
The new steel beam to support the Acoustic Folding Wall was designed, manufactured and installed to the ground floor flexible teaching space area.
The project is due for completion April 2022