Tiffin School, Kingston-upon-Thames

Project Info

  • Construction Date

    April 2018

  • Category

    Education

  • Value

    3.5M

  • Duration

    50 weeks

  • Achievement

    BREEAM Very Good

Dining, Kitchen and Classroom Extension

The works comprised of the erection of a new School extension, providing new accommodation, kitchen and dining facilities, as well as 5 teaching classrooms and offices.

The scope also included the demolition of the existing 1930s school building that previously stood on the site.

The new building was a concrete structure at ground floor, with a steel frame building above from first floor to roof.    

Construction included shear and girder walls at ground and first floor levels, a Monodraft Cool Phase and Heat recovery ventilation system, an area of green roof and the feature circular roofs were zinc clad.

Curtain walling was also included to elevations and zinc clad circular roof was also fitted.

In line with the Planning requirements, the building design and construction stages were delivered to meet the BREEAM Very Good accreditation requirements.