Brill House, Maidenhead

Project Info

  • Construction Date

    April 2019

  • Category

    Residential

  • Value

    2.8M

  • Duration

    69 weeks

For over 20 years Housing Solutions have been providing good quality, affordable homes to rent and buy across the South East of England.

Brill House is one of two key schemes Feltham Construction have worked on with Housing Solutions, the other being Warren Close.

This project comprised of the design and construction of four, 3-bedroom houses and four, 2-bedroom houses.

In addition, a 2-storey block containing 6 HMO (house in multiple occupation) units was also included on the scheme. The structure was built with a communal kitchen, dining area and lounge on the ground floor, as well as five 1-bedroom assisted living flats, including a separate bedroom area for staff accommodation.