Westbrook Hay Preparatory School, Hemel Hempstead

Project Info

  • Construction Date

    August 2015

  • Category

    Education

  • Value

    1.85M

  • Duration

    53 weeks

New Assembly Building

The scheme at Westbrook Hay School was the delivery of a new assembly hall, the structure provided a new reception, additional teaching rooms, and high-quality, tiered seatingĀ  theatre to the ground floor. The first floor housed further teaching rooms, conference areas and additional access to the upper tiered seating.

Demolition of the existing building was included, as well as the clearance of the site, before the construction could commence.

The site is within the centre of the North campus with existing buildings adjacent to each elevation.

Access to the site for the duration of the works was via temporary roadways , which was protected with fencing panels and netting, to ensure the upmost safety of all pupils, staff and the general public.