Cone Ripman House, Arts Education School, Chiswick

Project Info

  • Construction Date

    December 2020

  • Category

    Education

  • Value

    £6.5M

  • Duration

    62 weeks

New Arts Education and Classroom Building

The scope at ArtsEd London provides the students with an additional 2500m2 of new, high quality learning, performance and rehearsal areas. This scheme enables the School to build and grow their musical, drama and teaching facilities.

The project was delivered over 3 phases.

Phase 1 comprised of demolition of existing Studio Theatre and new purpose built classroom block to the rear of the site.

Phase 2 included the demolition of the detached Library building & toilet block to the east end of the site, as well as a new build studio theatre and re build of the East end zone.

Phase 3 involved the removal of existing pitched roof to the main building and the creation of a single storey extension.