The Origin project at Wootton Science Park, Abingdon involved the construction of a new steel-frame laboratory-enabled office building, complete with rainscreen cladding and curtain walling. Delivered as four high-specification lab-enabled office facilities, the building provides a total of 9,256 sq ft (860 sq m) of flexible space, designed to accommodate a 60:40 lab-to-office split.

The scheme incorporates features such as CL2 laboratory readiness, generous plant risers, a goods lift, Vulcathene drainage, EV charging, and extensive cycle parking, all within a landscaped science park environment. With an EPC A rating and BREEAM “Very Good” sustainability credentials, the Origin building offers tenants a future-ready workspace that balances technical capability with high-quality architectural design